Wellcome to National Portal
মেনু নির্বাচন করুন
Main Comtent Skiped

বাপাউবো’র অর্জনসমূহ

Completed BWDB Structures: up to June, 2020

SL

Description of Structures

Quantity

Unit

01.

Completed Projects

877

Nos

02.

Total Embankment

16353

km

03.

Coastal Embankment

5788

km

04.

Submergible Embankment

2625

km

05.

Other Embankment

7940

km

06.

Irrigation Canal

5355

km

07.

Drainage Channel

4502

km

08.

Hydraulics Structures

15488

Nos

09.

Barrage

4

Nos

10.

Rubber Dam

5

Nos

11.

Coastal Polder

139

Nos

12.

Bridge and Culvert

5737

Nos

13.

Road (Including Semi pacca)

1084

km

14.

Bank Protection

1287

km

15.

City Protection

31

Nos

16.

Spur/Groyene

251

Nos

17.

River Dredging

823

km

18.

River Re-Excavation

1320

km

19.

Land Reclamation

1045.80

sq-km

20.

FCD Area

6.496

m-ha

21.

Irrigation Area

1.635

m-ha

 

Note:

** 54 Gauge Station at 29 Rivers.

** With all these interventions 85 million People and 15 million Households are  protected from average floods and salinity.

****BWDB contributes 1.60% to the National GDP ****